Your settings for cookies and pixels on group.rwe

Select which cookies and pixels we are allowed to use. Please note that some cookies are necessary for technical reasons and must be enabled in order to maintain the functionality of our website. If you would like to benefit from every service on our website, please consider that you need to choose every cookie category. For more information, please refer to our Privacy Policy.

    • Maintain the stability of the website.
    • Save your log-in data.
    • Allow to improve the user experience.
    • They provide advertisements that are relevant to your interests.
    • They allow you to share interesting content directly with your social media network.

You can change your cookie and pixel settings on group.rwe at any time via our data privacy.

Imprint

Show Details
Select all Confirm selection
STA02-rwe-renewables-americas-llc
STA02-rwe-renewables-americas-llc

Onshore wind farm

Great Eppleton

Facts and figures

Wind farm location
Hetton-Le-Hole, Sunderland, England
Commissioned in
1997
Electrical output (gross)
8,2 MW
Number of units
4 turbines
Turbine height
115 m to blade tip

 

The beginning

Great Eppleton was first commissioned in March 1997. It was unique to our portfolio as it was the only project using twin-bladed turbines. Whilst the two-bladed technology is not obsolete, it's an ageing technology and the ongoing operational maintenance requirements were significant. In recent years, turbine technology has vastly increased. An individual turbine can now generate the same amount of electricity as the combined total (3 MW) of the four old turbines at Great Eppleton.

The re-power

In January 2007, we submitted a planning application to Sunderland City Council to re-power the wind farm. This included removing the old turbines and replacing them with state-of-the-art machines, that would significantly increase the capacity of the scheme. In June 2007, we received consent to proceed. Construction commenced in early September 2009, with the civil contractor, J. Breheny Contractors Ltd, constructing the new access roads, turbine bases, crane hard standings and the on-site switch house. During this period the electrical contractor, Agrilek Ltd, installed the wind farms electrical infrastructure and completed the electrical fit-out works on the on-site switch house building. The main construction works were completed at the end of January 2010, at which time delivery of the turbines and installation works began. Mechanical completion and pre-commissioning of the four 2MW wind turbine generators was completed at the end of February and they were first connected to the grid in early March. 

Project completion

Work has recently been completed on a settlement pond on the wind farm site which will provide a haven for wildlife, and in particular, the water vole. The settlement pond follows sponsorship of a water vole survey in the area surrounding the Great Eppleton site. All four turbines were generating at full capacity by the end of March 2010 and Great Eppleton is now an 8.2 MW wind farm.  

You might also be interested in

Bowbeat onshore wind farm

Bowbeat wind farm generates enough energy to supply nearly 16,000 homes.

Read more

Projects in America – Solar

Design through construction & operation: provide unparalleled landowner & customer relationships.

Read more