Your settings for cookies and pixels on group.rwe

Select which cookies and pixels we are allowed to use. Please note that some cookies are necessary for technical reasons and must be enabled in order to maintain the functionality of our website. If you would like to benefit from every service on our website, please consider that you need to choose every cookie category. For more information, please refer to our Privacy Policy.

    • Maintain the stability of the website.
    • Save your log-in data.
    • Allow to improve the user experience.
    • They provide advertisements that are relevant to your interests.
    • They allow you to share interesting content directly with your social media network.

You can change your cookie and pixel settings on group.rwe at any time via our data privacy.

Imprint

Show Details
Select all Confirm selection

Amrumbank West

Offshore wind farm

STA02-amrumbank
STA02-amrumbank

Facts and figures

Location

35 km northwest off the island of Heligoland

Comissioned in

2015

Total power

302 MW

Number of turbines

80

Turbine height

90m above sea level

 

The Amrumbank wind farm covers an area of approximately 32 km² and is located around 35 km north of the island of Heligoland and 37 km west of the North Frisian island of Amrum, inside the German Exclusive Economic Zone (EEZ). The distance from the nearest mainland coast is approximately 40 km. The offshore wind farm consists of 80 Siemens SWT-3.6-120 wind turbines with an installed capacity of 3.6 MW each, 288 MW in total. This is enough power to supply around 300,000 households with renewable energy, saving 432,278 tonnes of CO2 emissions annually. The turbines have a rotor diameter of 120 m (each rotor blade is 58.5 m long) and are situated in waters between 20 and 25 metres deep. The investment volume of the project was close to 1 billion euros.

To prepare for the construction work on Amrumbank offshore wind farm, the research vessel Ice Beam carried out an analysis of soil samples from the seabed. After a 500-m safety zone was established around the planned outer locations of the WEA to secure the wind farm construction site, construction work started in May 2013.

The monopile steel foundations with a weight of between 80 and 300 tonnes each were driven into the seabed from January 2014. The large six-leg wind turbine installation vessel MPI Discovery, which RWE Renewables (formerly E.ON Climate & Renewables) had chartered for the construction of the wind farm, was used to transport the elements from the port of Cuxhaven and erect them on site.
The first turbine was finally installed on 11 February 2015. The wind turbines were then commissioned one by one as the remaining turbines were erected. The first turbines went on stream in April 2015 and the complete wind farm was commissioned in October 2015.

Around 100 km of array cables were laid from the 80 wind turbines to the transformer station. An export cable transmits the power to the “HelWin beta” converter platform, which is 8 km away and transforms the three-phase alternating current (AC) from 155 kV to the ±320-kV level and converts it to direct current. The electricity is then transmitted through a submarine cable via high-voltage direct current transmission (HVDC “HelWin 2”) to the port town of Büsum, 85 km away, and from there another 45 km to the grid connection point at Brunsbüttel, where the electricity is converted back to three-phase alternating current (AC). 

The wind farm is owned by Amrumbank West GmbH, a 100 per cent subsidiary of RWE Renewables. The service and operating station for the Amrumbank West offshore wind farm is located on Heligoland.